Cityringen encircles the heart of Copenhagen with two parallel 15.5-kilometre-long tunnels, for a total of 31 kilometres. It includes 17 new fully equipped underground stations situated on average 30 metres below street level.
The new metro - commissioned by Metroselskabet, the public entity responsible for the metro network - will provide 85% of the population with a station every 600 m and a train passing every 80-100 seconds. It will connect with the existing metro line as well as bus and train stations, thereby reducing the need to travel by car.
0 Comments